Docket: 12-038-U

Style: IN THE MATTER OF THE APPLICATION ENTERGY ARKANSAS, INC., REQUEST FOR APPROVAL OF CERTAIN WHOLESALE BASE LOAD CAPACITY TO SERVE CUSTOMERS AND A PROPOSED RIDER RECOVERY MECHANISM FOR THESE AND OTHER CAPACITY COSTS

Electronic: True

Open: False

Service List: View


Document Numbers omitted from the following list of documents are assigned to Affidavits of Non-disclosure. Click here to view this Docket with Affidavits of Non-disclosure included.

Company Name Docket Role
Entergy Arkansas, Inc. Initiating Party
Arkansas Electric Energy Consumers, Inc. Intervenor
APSC General Staff Party
Attorney General of Arkansas Party
File Date/Time
Description
11:52:00 AM
6/13/2012
1. Entergy Arkansas, Inc., submits application for approval of certain wholesale base load capacity to serve EAI customers and a proposed rider recovery mechanism for these and other capacity costs. Kr Established Docket
11:52:00 AM
6/13/2012
2. Direct Testimony of Hugh T. McDonald-President and Chief Executive Officer on behalf of Entergy Arkansas, Inc. Kr
11:53:00 AM
6/13/2012
3. Direct Testimony and Exhibits of Kurtis W. Castleberry-Director of Resource Planning on behalf of Entergy Arkansas, Inc. Kr
11:56:00 AM
6/13/2012
4. Direct Testimony and Exhibits of Phillip B. Gillam-Director of Revenue Requirements and Analyses on behalf of Entergy Arkansas, Inc. Kr (Tariffs)
4:08:00 PM
6/13/2012
5. Entergy Arkansas, Inc. submits Motion for Protective Order of Non-Disclosure. Ks (Order #1)
10:55:00 AM
6/20/2012
6. Entergy Arkansas, Inc. submits corrected EAI Exhibit A to the Motion for Protective order filed June 13, 2012, in this docket. Ks
11:47:00 AM
6/20/2012
7. The General Staff of the Arkansas Public Service Commission submits Response to Motion for Protective Order. Ks
3:47:00 PM
6/20/2012
8. Letter from the Attorney General of Arkansas serving as written notice of their intent to be an active party in Docket No. 12-038-U. Ks
2:24:00 PM
6/28/2012
9. Order #1 (Commission) Entergy Arkansas Inc.'s (EAI) Motion for Protective Order of Non-Disclosure filed June 13, 2012 as conditioned herein is granted on and interim basis. EAI shall affix thereto a written Confidential information transmittal cover document in the form of Attachment 1-A or 1-B hereto containing the information required. Confidential Information to be provided in paper format shall be reproduced and filed or submitted on distinctive PINK paper only and if provided in digital format shall be reproduced and filed or submitted on a CD that is distinctively RED or PINK in color. The Commission's standard "AFFIDAVIT OF NON-DISCLOSURE" (Attachment 2 hereto) shall be executed and filed in this docket by all official party representatives to be granted access to said Confidential Information pursuant to this Interim Protective Order. The Commission hereby designates Commission Administrative Law Judge ("ALJ") Susan D'Auteuil to review and examine all Confidential Information filed or submitted pursuant to this Interim Protective Order and to rule upon any objections filed pursuant to the terms and conditions of this Interim Protective Order. Any party aggrieved by any amended Interim Protective Order or the Final Protective Order issued by the ALJ may petition the Commission for review and rehearing of such Order within thirty (30) days of the issuance of same. Cm
2:13:00 PM
7/10/2012
19. Arkansas Electric Energy Consumers, Inc., submits Petition to Intervene. Kr (Order #2)
11:30:00 AM
7/13/2012
20. Entergy Arkansas, Inc.'s Response to Petition to Intervene of Arkansas Electric Energy Consumers, Inc. Ks
3:20:00 PM
7/17/2012
21. The General Staff of the Arkansas Public Service Commission submits response to Petition to Intervene of Arkansas Electric Energy Consumers, Inc. Kr
10:50:00 AM
7/24/2012
26. Order #2 (COMMISSION) The Commission finds that Arkansas Electric Energy Consumers, Inc.(AEEC) Petition to Intervene is granted. the Commission also finds that AEEC's requests for relief, as set forth in sections (ii), (iii), and (iv) of the concluding paragraph of AEEC's Petition, are premature and are denied at this time without prejudice. AEEC may raise such issues in a subsequent pleading. Cm
12:02:00 PM
7/31/2012
28. Entergy Arkansas Inc., submits motion to establish procedural schedule. Kr (Order#3)
11:07:00 AM
8/3/2012
29. Entegra Power Group LLC submits Petition to Intervene. Ks (Order#4)
10:34:00 AM
8/6/2012
30. The General Staff of the Arkansas Public Service Commission submits its Response to Entergy Arkansas, Inc.'s Motion to Establish Procedural Schedule. Cm
10:48:00 AM
8/8/2012
31. ORDER#3 (COMMISSION) The Commission hereby establishes the following procedural schedule for consideration of Entergy Arkansas, Inc., (EAI) application: 1) an evidentiary hearing on EAI's Application is scheduled to begin at 9:30 a.m. on November 5, 2012, in Commission Hearing Room No. 1 located in the Arkansas Public Service Commission Building located at 1000 Center Street, Little Rock, Arkansas; 2)The Staff and Intervenor Direct Testimony shall be filed by noon on September 26, 2012; 3) EAI Rebuttal Testimony shall be filed by noon on October 10,2012; 4) EAI's Sur-Surrebuttal Testimony shall be filed by noon on October 31,2012; and 5) Petitions to Intervenue shall be filed no later than noon on August 26, 2012. kr
11:10:00 AM
8/13/2012
32. Entergy Arkansas, Inc., submits letter does not object to the intervention of Entegra Power Group LLC. in this docket. Cm
2:20:00 PM
8/13/2012
33. Response to Entegra Power Group LLC's Petition to Intervene filed by the General Staff of the Arkansas Public Service Commission. Ks
2:57:00 PM
8/13/2012
34. Response to Entegra Power Group LLC's Petition to Intervene filed by Attorney General of Arkansas. Cm
1:52:00 PM
8/14/2012
35. Petition to Intervene of Associated Electric Cooperative, Inc. Ks (Order#5)
10:58:00 AM
8/15/2012
36. The General Staff of the Arkansas Public Service Commission submits Response to Associated Electric Cooperative, Inc.'s Petition to Intervene. Ks
1:58:00 PM
8/15/2012
37. Attorney General of Arkansas submits response to Associated Electric Cooperative, Inc.'s Petition to Intervene. Cm
9:08:00 AM
8/16/2012
38. Entegra Power Group LLC's Response to Objections to it's Petition to Intervene Filed by the Attorney General and the Arkansas Public Service Commission. Ks
12:46:00 PM
8/23/2012
39. ORDER#4 (COMMISSION) Entegra's Petition is denied. However, Entegra is authorized to file a Limited Appearance Statement pursuant to Rule 3.04 (C) (1). Cm
10:22:00 AM
8/31/2012
41. ORDER #5 (COMMISSION) Associated Electric Cooperative, Inc., (AECI) Petition is denied. AECI is authorized to file a Limited Appearance Statement pursuant to Rule 3.04 (C) (1). Kr
10:23:00 AM
9/26/2012
46. Direct Testimony and Exhibit of William B. Marcus on behalf of the Attorney General of Arkansas. Ks
10:46:00 AM
9/26/2012
47. Redacted Direct Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas. Ks
10:50:00 AM
9/26/2012
48. Redacted Exhibits to the Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas. Ks
11:20:00 AM
9/26/2012
49. Testimony and Exhibits of Randall J. Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. Ks
11:21:00 AM
9/26/2012
50. Unredacted Prepared Direct Testimony and Exhibits of Randall Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. filed UNDER PROTECTED SEAL. Ks
11:25:00 AM
9/26/2012
51. Highly Sensitive Protected Information of Direct Testimony of Kevin Woodruff on behalf of Attorney General of Arkansas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
11:25:00 AM
9/26/2012
52. Highly Sensitive Protected Exhibits to the Direct Testimony of Kevin Woodruff on behalf of the Attorney General of Arkansas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Ks
11:28:00 AM
9/26/2012
53. Direct Testimony of Diana K. Brenske-Director of Electric Utilities Section on behalf of the General Staff of the Arkansas Public Service Commission. Kr
11:42:00 AM
9/26/2012
54. Direct Public Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Kr
11:42:00 AM
9/26/2012
55. Direct Public Exhibits of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Kr
11:46:00 AM
9/26/2012
56. The General Staff of the Arkansas Public Service Commission submits CONFIDENTIAL material of Direct Testimony of John Athas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
11:46:00 AM
9/26/2012
57. The General Staff of the Arkansas Public Service Commission submits CONFIDENTIAL material of Direct Exhibits to the Testimony of John Athas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
4:03:00 PM
9/26/2012
59. Attorney General of Arkansas submits errata Exhibit KDW W-24 for the Highly Sensitive Protected Information and Redacted Exhibits of Kevin Woodruff. Kr
11:40:00 AM
10/10/2012
60. Rebuttal Testimony of Hugh T. McDonald, President and Chief Executive Officer, on behalf of Entergy Arkansas, Inc. Cm
11:41:00 AM
10/10/2012
61. Rebuttal Testimony of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Cm
11:42:00 AM
10/10/2012
62. Rebuttal Testimony of Phillip B. Gillam, Director, Revenue Requirements and Analyses, Entergy Services, Inc. on behalf of Entergy Arkansas, Inc. Ks
11:45:00 AM
10/10/2012
63. Rebuttal Testimony and Exhibits of Charles E. DeGeorge, Manager, Supply Planning & Analysis, Entergy Services, Inc. on behalf of Entergy Arkansas, Inc. Ks
11:46:00 AM
10/10/2012
64. Rebuttal Testimony and Exhibits of Karen M. Radosevich, Manager, Forecasting Analysis on behalf of Entergy Arkansas, Inc. Cm
10:50:00 AM
10/24/2012
66. Surrebuttal Testimony and Exhibits of Randall J. Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. Kr
10:51:00 AM
10/24/2012
67. Surrebuttal Testimony of William B. Marcus on behalf of the Arkansas Attorney General. Kr
11:04:00 AM
10/24/2012
68. Surrebuttal Testimony of Diana K. Brenske, Director, Electric Utilities Section, on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:04:00 AM
10/24/2012
69. Surrebuttal Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:17:00 AM
10/24/2012
70. Public-Surrebuttal Testimony and Exhibits of Kevin D. Woodruff on behalf of The Attorney General of Arkansas. Kr
11:04:00 AM
10/24/2012
71. UREDACTED and CONFIDENTIAL Surrebuttal Exhibit of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission on June 28, 2012 pursuant to Interim Protective Order No. 1. Cm
11:34:00 AM
10/24/2012
72. Arkansas Electric Energy Consumers, Inc., submit CONFIDENTIAL information of Surrebuttal Testimony and Exhibits of Randall J. Falkenberg filed under seal of Interim Protected Order No. 1 in this docket. Kr
11:43:00 AM
10/24/2012
73. HSPI version of Surrebuttal Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas filed UNDER SEAL pursuant to Interim Protective Order No. 1. Cm
11:44:00 AM
10/24/2012
74. HSPI version of the Exhibits to the Surrebuttal Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas filed UNDER SEAL pursuant to Interim Protective Order No. 1. Cm
11:51:00 AM
10/31/2012
75. Sur-Surrebuttal Testimony of Hugh T. McDonald on behalf of Entergy Arkansas, Inc. Cm
11:51:00 AM
10/31/2012
76. Sur-Surrebuttal Testimony and Exhibits of Kurtis W. Castleberry on behalf of Entergy Arkansas, Inc. Cm
11:52:00 AM
10/31/2012
77. Sur-Surrebuttal Testimony and Exhibits of Phillip B. Gillam on behalf of Entergy Arkansas, Inc. Cm
2:12:00 PM
10/31/2012
78. Entergy Arkansas, Inc., submits Highly Sensitive Protected Exhibit KWC-3 to the Sur-surrebuttal Testimony and Exhibits of Kurtis W. Castleberry filed on October 31, 2012 pursuant to Interim Protective Order No. 1. Cm
8:07:00 AM
11/6/2012
79. ORDER #6 (COMMISSION) The Commission directs and orders as follows: 1.) Each Party, including Entergy Arkansas, Inc., shall filed by 4:00 p.m. on Friday, November 9, 2012, a Post-Hearing Final Statement of Position Detailing and clarifying its final position and recommendation in this matter. Cm
3:30:00 PM
11/9/2012
80. Joint Post-Hearing Final Statement of Position and Recommendations of the Arkansas Attorney General, Arkansas Electric Energy Consumer's Inc., and Entergy Arkansas, Inc. in Response to Order No. 6. Cm
3:44:00 PM
11/9/2012
81. The General Staff of the Arkansas Public Service Commission submits Post-Hearing Final Statement of Position. Cm (Order #7)
9:36:00 AM
11/14/2012
82. Transcript of Hearing held November 5, 2012 Volumes I - III filed by Bushman Court Reporting. Cm
11:05:00 AM
11/14/2012
83. CONFIDENTIAL Transcript of hearing held on November 5, 2012 of PREFILED TESTIMONY of Randall J. Falkenberg, pages 346-396, and pages 418-438; CONFIDENTIAL PREFILED TESTIMONY of Kevin D. Woodruff, pages 492-528, pages 559-576; CONFIDENTIAL PREFILED TESTIMONY of John Athas pages 698- 712. Cm
9:37:00 AM
11/14/2012
84. EXHIBITS to Transcript of hearing held November 5, 2012 filed by Bushman Court Reporting. Cm
9:37:00 AM
11/14/2012
85. CONFIDENTIAL Exhibits to Transcript of hearing held on November 5, 2012 of Capacity Sale and Fuel Conversion Services Agreement pages 32-236; CONFIDENTIAL Exhibits of RJF-1-6, pages 293-336 and RJF-1S, pages 341-369 ; CONFIDENTIAL Exhibits of Kevin D. Woodruff, pages 470-625; HSPI CONFIDENTIAL Exhibits of Kevin D. Woodruff, pages 643-701; CONFIDENTIAL Exhibits of John G. Athas, pages 772-830; CONFIDENTIAL Exhibits of JGA-5, pages 831-835. Cm
4:14:00 PM
11/30/2012
86. ORDER#7 (COMMISSION) The Commission orders and directs as follows: 1)The AN0 Unit 1 Available WBL Capacity (70 MW) shall be assigned to serve retail customers beginning January 1, 2013, and the AN0 Unit 2 Available WBL Capacity (84 MW) shall be assigned to retail customers beginning December 19, 2013. Both units shall be assigned to retail on a life-of-unit basis; 2) Entergy Arkansas, Inc. (EAI) shall be allowed to recover the non-fuel costs for the AN0 Unit 1 Available WBL Capacity (70 MW) through Staff’s proposed ANOR (included as Attachment 1 to Staffs Statement of Position), with the exception of the last sentence of Note G to Attachment B - Schedule Sheet 6 of 6, effective with the first billing cycle of January 2013 subject to the following conditions; 3) The Parties are directed to propose a procedural schedule for the expedited consideration and resolution of the contested ANOR Note G language; 4) The Commission approves EAI’s sale of the portions of the remaining Available WBL Capacity for the non-retained share of Grand Gulf, White Bluff Units 1 and 2, and Independence Unit 1 to third parties on a life-of-unit basis (or less); 5) The Parties are directed to jointly develop and expeditiously propose a procedural schedule for the second phase PPA proceeding leading to a final Commission order on or about May 31,2013; and 6) EAI is directed to seek Commission approval prior to making any wholesale capacity sales from generation resources allocated to retail so that the Commission can evaluate whether such transactions are in the public interest. Kr
11:01:00 AM
12/14/2012
87. The General Staff of the Arkansas Public Service Commission and Entergy Arkansas, Inc. submits its Joint Compliance Filing. Cm (Order #8)
11:34:00 AM
12/27/2012
89. ORDER #8 (COMMISSION) the Commission hereby approves revised Arkansas Nuclear One Recovery Rider Schedule Sheet 6 of 6 as filed by Staff and Entergy Arkansas, Inc., on December 14,2012, to be effective with the first billing cycle of 2013. kr
9:37:00 AM
1/4/2013
90. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting James M. Graves for Brain Donahue-Attorney in this docket. Kr
4:02:00 PM
1/4/2013
91. Arkansas Electric Energy Consumers, Inc., submits affidavit of James M. Graves. Kr
2:19:00 PM
1/8/2013
93. Entergy Arkansas, Inc., submits motion to establish procedural schedule. Kr
12:29:00 PM
1/15/2013
94. ORDER #9 (COMMISSION) The following procedural schedule is hereby established for consideration of both the contested Arkansas Nuclear One Recovery Note G language and the two proposed Purchase Power Agreements: 1. Entergy Arkansas, Inc., (EAI) Direct Testimony shall be fled by noon on January 18,2013; 2. Staff/Intervenor Direct Testimony shall be filed by noon on March 1,2013; 3. EAI Rebuttal Testimony shall be fled by noon on March 15,2013; 4. Staff/lntervenor Surrebuttal Testimony shall be fled by noon on March 29, 2013; 5. EAI Sur-surrebuttal Testimony shall be filed by noon on April 5,2013; 6. Any settlement shall be filed no later than April 19,2013; and 7. An evidentiary hearing is scheduled to begin at 9:30 a.m. on May 1,2013, in Commission Hearing Room No. 1 located in the Arkansas Public Service Commission Building located at 1000 Center Street, Little Rack, Arkansas. Kr
11:53:00 AM
1/18/2013
95. Phase II Direct Testimony and Exhibits of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Cm
11:55:00 AM
1/18/2013
96. Phase II Direct Testimony and Exhibits of David E. Hunt, Director, Regulatory Accounting on behalf of Entergy Arkansas, Inc. Cm
12:50:00 PM
1/18/2013
97. Entergy Arkansas, Inc., submits Highly Sensitive Protected CONFIDENTIAL material {Presentation of Evaluation Results fur EAI 2011 RFP} of Exhibits to the Phase II Direct Testimony of Kurtis W. Castleberry. Kr
12:51:00 PM
1/18/2013
98. Entergy Arkansas, Inc., submits Highly Sensitive Protected CONFIDENTIAL material {Capcity Sale and Fuel Conversion Services Agreement dated October 22, 2012} of Exhibits to the Phase II Direct Testimony of Kurtis W. Castleberry. Kr
9:56:00 AM
3/1/2013
99. The Attorney General of Arkansas will not be filing Direct Testimony in this referenced docket today, but reserves the right to file Surrebuttal Testimony if necessary. Cm
11:02:00 AM
3/1/2013
100. Phase II Direct Public Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:07:00 AM
3/1/2013
101. Exhibits to Testimony of John G. Athas-6 on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:18:00 AM
3/1/2013
102. Exhibits to Testimony of John G. Athas-7 on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:29:00 AM
3/1/2013
103. Protected Phase II Direct Testimony of John G. Athas filed under PROTECTED SEAL on behalf of the General Staff of the Arkansas Public Service Commission. Cm
11:37:00 AM
3/1/2013
104. Protected Phase II Exhibit JGA-7 of John G. Athas filed under PROTECTED SEAL on behalf of the General Staff of the Arkansas Public Service Commission. Cm
9:21:00 AM
3/1/2013
105. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Michael Roberts and Emily Neal for James M. Graves-Attorney in this docket. Kr
8:33:00 AM
3/4/2013
106. The General Staff of the Arkansas Public Service Commission submits its Motion to Allow Late-Filed Testimony. Sr (ORDER #10)
8:39:00 AM
3/4/2013
107. Phase II Direct Testimony of Diana K. Brenske on behalf of the General Staff of the Arkansas Public Service Commission. Sr
10:36:00 AM
3/4/2013
108. Entergy Arkansas, Inc., has no objection to the Public Service Commission General Staff’s Motion to Allow the Late-Filed Testimony of Staff witness Diana Brenske filed in this docket on March 4, 2013. Cm
9:29:00 AM
3/12/2013
109. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Jana Law for Michael Roberts. Kr
10:35:00 AM
3/15/2013
113. Phase II Rebuttal Testimony of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Sr
10:32:00 AM
3/25/2013
114. Entergy Arkansas, Inc., and the General Staff of the Arkansas Public Service Commission submits Joint Motion to Cancel Hearing and Decide The Case on The Written Record. Sr (Order #11)
2:50:00 PM
3/26/2013
115. Letter filed by Entergy Arkansas, Inc. (EAI), as a supplement to the Joint Motion to Cancel Hearing and Decide the Case on the Written Record. With respect to paragraph 5 of the Motion, EAI has been authorized by Arkansas Electric Energy Consumers, Inc. to state that AEEC does not object to the Motion. Cm
8:01:00 AM
3/28/2013
116. ORDER #10 (COMMISSION) Motion to Allow Late-Filed Testimony filed on March 4, 2013, by the General Staff of the Arkansas Public Service Commission is hereby granted. Sr
4:24:00 PM
3/28/2013
117. ORDER #11 (COMMISSION) Given that there are no unresolved issues in Phase II and absent the objection of any party, Entergy Arkansas, Inc., and the General Staff of the Arkansas Public Service Commission Joint Motion to Cancel Hearing and Decide The Case on The Written Record is granted and the hearing scheduled for May 1, 2013, is cancelled. As requested, the Commission will issue its final decision in this matter based upon the existing evidence of Record. Kr
2:34:00 PM
4/10/2013
118. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Thomas P. Schroedter and Robert K. Rhoads for Michael Roberts, Emily Neal and Jana Law in this docket. Kr
4:28:00 PM
4/30/2013
119. ORDER #12 (COMMISSION) the Commission directs and orders as follows: 1. Entergy Arkansas, Inc. (EAI) Power Purchase Agreement Proposal No. 2445 is approved; 2. EAI shall implement the recommendations for improvement of EAI’s resource planning process as set forth in the Phase II Direct Testimony of Staff witness Athas; 3) EA1 is directed to file within ten (10) days of the date of this Order a revised ANOR Rider in compliance with this Order; and 4) Staff shall file Compliance Testimony within five (5) days of the filing by EAI of its revised ANOR Rider. Kr
11:21:00 AM
5/10/2013
120. Entergy Arkansas, Inc., submits Rate Schedule No. 55, Arkansas Nuclear One, Unit 1 Interim Capacity Cost Recovery Rider (ANOR), Schedule Sheet 6 of 6, as revised to comply with Order No. 12 issued in this proceeding on April 30, 2013. kr (Order #13)
12:22:00 PM
5/10/2013
121. Compliance Testimony of Diana K. Brenske, Director, Electric Utilities Section on behalf of The Staff of the Arkansas Public Service Commission. Sr
10:31:00 AM
5/29/2013
122. ORDER #13 (COMMISSION) The Commission finds that Entergy Arkansas, Inc., revised ANOR Rider Attachment B-Schedule Sheet 6 of 6, as filed on May 10, 2013, is in compliance with Order No. 12. Accordingly, such revised ANOR Rider Attachment B - Schedule Sheet 6 of 6 is hereby approved. Kr
2:14:00 PM
7/16/2013
124. Order #14 (Commission) Closed Docket. Cm
9:07:00 AM
11/26/2013
125. Entergy Arkansas, Inc., submits Rate Schedule No. 55, Arkansas Nuclear One, Unit 1 Interim Capacity Cost Recovery Rider (ANOR), revising Schedule Sheet 3 of 6, 4 of 6, and 5 of 6. Sr
9:24:00 AM
12/13/2013
126. Compliance Testimony of Regina L. Butler, Senior Rate Case Analyst, on behalf of The General Staff of the Arkansas Public Service Commission. DH
2:31:00 PM
12/17/2013
127. Order #15 (Commission) Accordingly, for good cause shown, the revised Rider ANOR Attachments A and B filed by Entergy Arkansas, Inc., on November 26, 2013, are hereby approved. Cm
4:41:00 PM
4/1/2014
128. Entergy Arkansas, Inc., submits Rate Schedule No. 55, Arkansas Nuclear One, Unit 1 Interim Capacity Cost Recovery Rider (Rider ANOR). Cm (ORDER NO.16)
12:37:00 PM
4/21/2014
129. Compliance Testimony of Katrina Owoh, Rate Case Analyst on behalf of the General Staff of the Arkansas Public Service Commission. Cm
2:10:00 PM
4/23/2014
130. ORDER NO.16 (COMMISSION) Accordingly, for good cause shown, the revised Rider ANOR Attachments A and B filed by Entergy Arkansas, Inc., (EAI) on April 1, 2014, are hereby approved to be effective for bills rendered on or after May 1, 2014. Sr
3:07:00 PM
4/28/2014
131. Entergy Arkansas, Inc., submits Motion for Clarification and Correction of a Scrivener's Error. Sr
12:00:00 PM
4/29/2014
132. Order #17 (Commission) The final sentence of Order No. 16 is hereby amended by deleting the words “effective for bills rendered on or after May 1, 2014.” and substituting the words “effective beginning with the first billing cycle of May, 2014.” Furthermore, for good cause shown, corrected Revised Attachment A as filed by Entergy Arkansas, Inc. on April 28, 2014 is hereby approved. Cm
11:57:00 AM
1/16/2015
133. Arkansas Electric Energy Consumers, Inc. (AEEC) submits Notice that AEEC has retained Tinsley & Youngdahl, PLLC to represent AEEC in this docket and requesting Jordan B. Tinsley be substituted for all previous counsel. Ms.
9:16:00 AM
1/22/2015
134. Entergy Arkansas, Inc. submits a request to withdraw Rate Schedule No. 55 and update the Table of Contents and EAI Rate Schedule Nos. 17, 20, and 49. Also included is the Direct Testimony of Myra L. Talkington, Manager, Regulatory Filings, Entergy Services, Inc. filed on behalf of Entergy Arkansas, Inc. Ks