11:52:00 AM 6/13/2012 |
1. Entergy Arkansas, Inc., submits application for approval of certain wholesale base load capacity to serve EAI customers and a proposed rider recovery mechanism for these and other capacity costs. Kr Established Docket
|
11:52:00 AM 6/13/2012 |
2. Direct Testimony of Hugh T. McDonald-President and Chief Executive Officer on behalf of Entergy Arkansas, Inc. Kr
|
11:53:00 AM 6/13/2012 |
3. Direct Testimony and Exhibits of Kurtis W. Castleberry-Director of Resource Planning on behalf of Entergy Arkansas, Inc. Kr
|
11:56:00 AM 6/13/2012 |
4. Direct Testimony and Exhibits of Phillip B. Gillam-Director of Revenue Requirements and Analyses on behalf of Entergy Arkansas, Inc. Kr (Tariffs)
|
4:08:00 PM 6/13/2012 |
5. Entergy Arkansas, Inc. submits Motion for Protective Order of Non-Disclosure. Ks (Order #1)
|
10:55:00 AM 6/20/2012 |
6. Entergy Arkansas, Inc. submits corrected EAI Exhibit A to the Motion for Protective order filed June 13, 2012, in this docket. Ks
|
11:47:00 AM 6/20/2012 |
7. The General Staff of the Arkansas Public Service Commission submits Response to Motion for Protective Order. Ks
|
3:47:00 PM 6/20/2012 |
8. Letter from the Attorney General of Arkansas serving as written notice of their intent to be an active party in Docket No. 12-038-U. Ks
|
2:24:00 PM 6/28/2012 |
9. Order #1 (Commission) Entergy Arkansas Inc.'s (EAI) Motion for Protective Order of Non-Disclosure filed June 13, 2012 as conditioned herein is granted on and interim basis. EAI shall affix thereto a written Confidential information transmittal cover document in the form of Attachment 1-A or 1-B hereto containing the information required. Confidential Information to be provided in paper format shall be reproduced and filed or submitted on distinctive PINK paper only and if provided in digital format shall be reproduced and filed or submitted on a CD that is distinctively RED or PINK in color. The Commission's standard "AFFIDAVIT OF NON-DISCLOSURE" (Attachment 2 hereto) shall be executed and filed in this docket by all official party representatives to be granted access to said Confidential Information pursuant to this Interim Protective Order. The Commission hereby designates Commission Administrative Law Judge ("ALJ") Susan D'Auteuil to review and examine all Confidential Information filed or submitted pursuant to this Interim Protective Order and to rule upon any objections filed pursuant to the terms and conditions of this Interim Protective Order. Any party aggrieved by any amended Interim Protective Order or the Final Protective Order issued by the ALJ may petition the Commission for review and rehearing of such Order within thirty (30) days of the issuance of same. Cm
|
2:13:00 PM 7/10/2012 |
19. Arkansas Electric Energy Consumers, Inc., submits Petition to Intervene. Kr (Order #2)
|
11:30:00 AM 7/13/2012 |
20. Entergy Arkansas, Inc.'s Response to Petition to Intervene of Arkansas Electric Energy Consumers, Inc. Ks
|
3:20:00 PM 7/17/2012 |
21. The General Staff of the Arkansas Public Service Commission submits response to Petition to Intervene of Arkansas Electric Energy Consumers, Inc. Kr
|
10:50:00 AM 7/24/2012 |
26. Order #2 (COMMISSION) The Commission finds that Arkansas Electric Energy Consumers, Inc.(AEEC) Petition to Intervene is granted. the Commission also finds that AEEC's requests for relief, as set forth in sections (ii), (iii), and (iv) of the concluding paragraph of AEEC's Petition, are premature and are denied at this time without prejudice. AEEC may raise such issues in a subsequent pleading. Cm
|
12:02:00 PM 7/31/2012 |
28. Entergy Arkansas Inc., submits motion to establish procedural schedule. Kr (Order#3)
|
11:07:00 AM 8/3/2012 |
29. Entegra Power Group LLC submits Petition to Intervene. Ks (Order#4)
|
10:34:00 AM 8/6/2012 |
30. The General Staff of the Arkansas Public Service Commission submits its Response to Entergy Arkansas, Inc.'s Motion to Establish Procedural Schedule. Cm
|
10:48:00 AM 8/8/2012 |
31. ORDER#3 (COMMISSION) The Commission hereby establishes the following procedural schedule for consideration of Entergy Arkansas, Inc., (EAI) application: 1) an evidentiary hearing on EAI's Application is scheduled to begin at 9:30 a.m. on November 5, 2012, in Commission Hearing Room No. 1 located in the Arkansas Public Service Commission Building located at 1000 Center Street, Little Rock, Arkansas; 2)The Staff and Intervenor Direct Testimony shall be filed by noon on September 26, 2012; 3) EAI Rebuttal Testimony shall be filed by noon on October 10,2012; 4) EAI's Sur-Surrebuttal Testimony shall be filed by noon on October 31,2012; and 5) Petitions to Intervenue shall be filed no later than noon on August 26, 2012. kr
|
11:10:00 AM 8/13/2012 |
32. Entergy Arkansas, Inc., submits letter does not object to the intervention of Entegra Power Group LLC. in this docket. Cm
|
2:20:00 PM 8/13/2012 |
33. Response to Entegra Power Group LLC's Petition to Intervene filed by the General Staff of the Arkansas Public Service Commission. Ks
|
2:57:00 PM 8/13/2012 |
34. Response to Entegra Power Group LLC's Petition to Intervene filed by Attorney General of Arkansas. Cm
|
1:52:00 PM 8/14/2012 |
35. Petition to Intervene of Associated Electric Cooperative, Inc. Ks (Order#5)
|
10:58:00 AM 8/15/2012 |
36. The General Staff of the Arkansas Public Service Commission submits Response to Associated Electric Cooperative, Inc.'s Petition to Intervene. Ks
|
1:58:00 PM 8/15/2012 |
37. Attorney General of Arkansas submits response to Associated Electric Cooperative, Inc.'s Petition to Intervene. Cm
|
9:08:00 AM 8/16/2012 |
38. Entegra Power Group LLC's Response to Objections to it's Petition to Intervene Filed by the Attorney General and the Arkansas Public Service Commission. Ks
|
12:46:00 PM 8/23/2012 |
39. ORDER#4 (COMMISSION) Entegra's Petition is denied. However, Entegra is authorized to file a Limited Appearance Statement pursuant to Rule 3.04 (C) (1). Cm
|
10:22:00 AM 8/31/2012 |
41. ORDER #5 (COMMISSION) Associated Electric Cooperative, Inc., (AECI) Petition is denied. AECI is authorized to file a Limited Appearance Statement pursuant to Rule 3.04 (C) (1). Kr
|
10:23:00 AM 9/26/2012 |
46. Direct Testimony and Exhibit of William B. Marcus on behalf of the Attorney General of Arkansas. Ks
|
10:46:00 AM 9/26/2012 |
47. Redacted Direct Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas. Ks
|
10:50:00 AM 9/26/2012 |
48. Redacted Exhibits to the Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas. Ks
|
11:20:00 AM 9/26/2012 |
49. Testimony and Exhibits of Randall J. Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. Ks
|
11:21:00 AM 9/26/2012 |
50. Unredacted Prepared Direct Testimony and Exhibits of Randall Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. filed UNDER PROTECTED SEAL. Ks
|
11:25:00 AM 9/26/2012 |
51. Highly Sensitive Protected Information of Direct Testimony of Kevin Woodruff on behalf of Attorney General of Arkansas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
|
11:25:00 AM 9/26/2012 |
52. Highly Sensitive Protected Exhibits to the Direct Testimony of Kevin Woodruff on behalf of the Attorney General of Arkansas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Ks
|
11:28:00 AM 9/26/2012 |
53. Direct Testimony of Diana K. Brenske-Director of Electric Utilities Section on behalf of the General Staff of the Arkansas Public Service Commission. Kr
|
11:42:00 AM 9/26/2012 |
54. Direct Public Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Kr
|
11:42:00 AM 9/26/2012 |
55. Direct Public Exhibits of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Kr
|
11:46:00 AM 9/26/2012 |
56. The General Staff of the Arkansas Public Service Commission submits CONFIDENTIAL material of Direct Testimony of John Athas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
|
11:46:00 AM 9/26/2012 |
57. The General Staff of the Arkansas Public Service Commission submits CONFIDENTIAL material of Direct Exhibits to the Testimony of John Athas filed under seal pursuant to Interim Protective Order No. 1 in this docket. Kr
|
4:03:00 PM 9/26/2012 |
59. Attorney General of Arkansas submits errata Exhibit KDW W-24 for the Highly Sensitive Protected Information and Redacted Exhibits of Kevin Woodruff. Kr
|
11:40:00 AM 10/10/2012 |
60. Rebuttal Testimony of Hugh T. McDonald, President and Chief Executive Officer, on behalf of Entergy Arkansas, Inc. Cm
|
11:41:00 AM 10/10/2012 |
61. Rebuttal Testimony of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Cm
|
11:42:00 AM 10/10/2012 |
62. Rebuttal Testimony of Phillip B. Gillam, Director, Revenue Requirements and Analyses, Entergy Services, Inc. on behalf of Entergy Arkansas, Inc. Ks
|
11:45:00 AM 10/10/2012 |
63. Rebuttal Testimony and Exhibits of Charles E. DeGeorge, Manager, Supply Planning & Analysis, Entergy Services, Inc. on behalf of Entergy Arkansas, Inc. Ks
|
11:46:00 AM 10/10/2012 |
64. Rebuttal Testimony and Exhibits of Karen M. Radosevich, Manager, Forecasting Analysis on behalf of Entergy Arkansas, Inc. Cm
|
10:50:00 AM 10/24/2012 |
66. Surrebuttal Testimony and Exhibits of Randall J. Falkenberg on behalf of Arkansas Electric Energy Consumers, Inc. Kr
|
10:51:00 AM 10/24/2012 |
67. Surrebuttal Testimony of William B. Marcus on behalf of the Arkansas Attorney General. Kr
|
11:04:00 AM 10/24/2012 |
68. Surrebuttal Testimony of Diana K. Brenske, Director, Electric Utilities Section, on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:04:00 AM 10/24/2012 |
69. Surrebuttal Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:17:00 AM 10/24/2012 |
70. Public-Surrebuttal Testimony and Exhibits of Kevin D. Woodruff on behalf of The Attorney General of Arkansas. Kr
|
11:04:00 AM 10/24/2012 |
71. UREDACTED and CONFIDENTIAL Surrebuttal Exhibit of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission on June 28, 2012 pursuant to Interim Protective Order No. 1. Cm
|
11:34:00 AM 10/24/2012 |
72. Arkansas Electric Energy Consumers, Inc., submit CONFIDENTIAL information of Surrebuttal Testimony and Exhibits of Randall J. Falkenberg filed under seal of Interim Protected Order No. 1 in this docket. Kr
|
11:43:00 AM 10/24/2012 |
73. HSPI version of Surrebuttal Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas filed UNDER SEAL pursuant to Interim Protective Order No. 1. Cm
|
11:44:00 AM 10/24/2012 |
74. HSPI version of the Exhibits to the Surrebuttal Testimony of Kevin D. Woodruff on behalf of the Attorney General of Arkansas filed UNDER SEAL pursuant to Interim Protective Order No. 1. Cm
|
11:51:00 AM 10/31/2012 |
75. Sur-Surrebuttal Testimony of Hugh T. McDonald on behalf of Entergy Arkansas, Inc. Cm
|
11:51:00 AM 10/31/2012 |
76. Sur-Surrebuttal Testimony and Exhibits of Kurtis W. Castleberry on behalf of Entergy Arkansas, Inc. Cm
|
11:52:00 AM 10/31/2012 |
77. Sur-Surrebuttal Testimony and Exhibits of Phillip B. Gillam on behalf of Entergy Arkansas, Inc. Cm
|
2:12:00 PM 10/31/2012 |
78. Entergy Arkansas, Inc., submits Highly Sensitive Protected Exhibit KWC-3 to the Sur-surrebuttal Testimony and Exhibits of Kurtis W. Castleberry filed on October 31, 2012 pursuant to Interim Protective Order No. 1. Cm
|
8:07:00 AM 11/6/2012 |
79. ORDER #6 (COMMISSION) The Commission directs and orders as follows: 1.) Each Party, including Entergy Arkansas, Inc., shall filed by 4:00 p.m. on Friday, November 9, 2012, a Post-Hearing Final Statement of Position Detailing and clarifying its final position and recommendation in this matter. Cm
|
3:30:00 PM 11/9/2012 |
80. Joint Post-Hearing Final Statement of Position and Recommendations of the Arkansas Attorney General, Arkansas Electric Energy Consumer's Inc., and Entergy Arkansas, Inc. in Response to Order No. 6. Cm
|
3:44:00 PM 11/9/2012 |
81. The General Staff of the Arkansas Public Service Commission submits Post-Hearing Final Statement of Position. Cm (Order #7)
|
9:36:00 AM 11/14/2012 |
82. Transcript of Hearing held November 5, 2012 Volumes I - III filed by Bushman Court Reporting. Cm
|
11:05:00 AM 11/14/2012 |
83. CONFIDENTIAL Transcript of hearing held on November 5, 2012 of PREFILED TESTIMONY of Randall J. Falkenberg, pages 346-396, and pages 418-438; CONFIDENTIAL PREFILED TESTIMONY of Kevin D. Woodruff, pages 492-528, pages 559-576; CONFIDENTIAL PREFILED TESTIMONY of John Athas pages 698- 712. Cm
|
9:37:00 AM 11/14/2012 |
84. EXHIBITS to Transcript of hearing held November 5, 2012 filed by Bushman Court Reporting. Cm
|
9:37:00 AM 11/14/2012 |
85. CONFIDENTIAL Exhibits to Transcript of hearing held on November 5, 2012 of Capacity Sale and Fuel Conversion Services Agreement pages 32-236; CONFIDENTIAL Exhibits of RJF-1-6, pages 293-336 and RJF-1S, pages 341-369 ; CONFIDENTIAL Exhibits of Kevin D. Woodruff, pages 470-625; HSPI CONFIDENTIAL Exhibits of Kevin D. Woodruff, pages 643-701; CONFIDENTIAL Exhibits of John G. Athas, pages 772-830; CONFIDENTIAL Exhibits of JGA-5, pages 831-835. Cm
|
4:14:00 PM 11/30/2012 |
86. ORDER#7 (COMMISSION) The Commission orders and directs as follows: 1)The AN0 Unit 1 Available WBL Capacity (70 MW) shall be assigned to serve retail customers beginning January 1, 2013, and the AN0 Unit 2 Available WBL Capacity (84 MW) shall be assigned to retail customers beginning December 19, 2013. Both units shall be assigned to retail on a life-of-unit basis; 2) Entergy Arkansas, Inc. (EAI) shall be allowed to recover the non-fuel costs for the AN0 Unit 1
Available WBL Capacity (70 MW) through Staff’s proposed ANOR (included as Attachment 1 to Staffs Statement of Position), with the exception of the last sentence of Note G to Attachment B - Schedule Sheet 6 of 6, effective with the first billing cycle of January 2013 subject to the following conditions; 3) The Parties are directed to propose a procedural schedule for the expedited consideration and resolution of the contested ANOR Note G language; 4) The Commission approves EAI’s sale of the portions of the remaining Available WBL Capacity for the non-retained share of Grand Gulf, White Bluff Units 1 and 2, and Independence Unit 1 to third parties on a life-of-unit basis (or less); 5) The Parties are directed to jointly develop and expeditiously propose a procedural schedule for the second phase PPA proceeding leading to a final Commission order on or about May 31,2013; and 6) EAI is directed to seek Commission approval prior to making any wholesale capacity sales from generation resources allocated to retail so that the
Commission can evaluate whether such transactions are in the public interest. Kr
|
11:01:00 AM 12/14/2012 |
87. The General Staff of the Arkansas Public Service Commission and Entergy Arkansas, Inc. submits its Joint Compliance Filing. Cm (Order #8)
|
11:34:00 AM 12/27/2012 |
89. ORDER #8 (COMMISSION) the Commission hereby approves revised Arkansas Nuclear One Recovery Rider Schedule Sheet 6 of 6 as filed by Staff and Entergy Arkansas, Inc., on December 14,2012, to be effective with the first billing cycle of 2013. kr
|
9:37:00 AM 1/4/2013 |
90. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting James M. Graves for Brain Donahue-Attorney in this docket. Kr
|
4:02:00 PM 1/4/2013 |
91. Arkansas Electric Energy Consumers, Inc., submits affidavit of James M. Graves. Kr
|
2:19:00 PM 1/8/2013 |
93. Entergy Arkansas, Inc., submits motion to establish procedural schedule. Kr
|
12:29:00 PM 1/15/2013 |
94. ORDER #9 (COMMISSION) The following procedural schedule is hereby established for consideration of both
the contested Arkansas Nuclear One Recovery Note G language and the two proposed Purchase Power Agreements:
1. Entergy Arkansas, Inc., (EAI) Direct Testimony shall be fled by noon on January 18,2013; 2. Staff/Intervenor Direct Testimony shall be filed by noon on March 1,2013; 3. EAI Rebuttal Testimony shall be fled by noon on March 15,2013; 4. Staff/lntervenor Surrebuttal Testimony shall be fled by noon on March 29, 2013; 5. EAI Sur-surrebuttal Testimony shall be filed by noon on April 5,2013; 6. Any settlement shall be filed no later than April 19,2013; and 7. An evidentiary hearing is scheduled to begin at 9:30 a.m. on May 1,2013, in Commission Hearing Room No. 1 located in the Arkansas Public Service Commission Building located at 1000 Center Street, Little Rack, Arkansas. Kr
|
11:53:00 AM 1/18/2013 |
95. Phase II Direct Testimony and Exhibits of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Cm
|
11:55:00 AM 1/18/2013 |
96. Phase II Direct Testimony and Exhibits of David E. Hunt, Director, Regulatory Accounting on behalf of Entergy Arkansas, Inc. Cm
|
12:50:00 PM 1/18/2013 |
97. Entergy Arkansas, Inc., submits Highly Sensitive Protected CONFIDENTIAL material {Presentation of Evaluation
Results fur EAI 2011 RFP} of Exhibits to the Phase II Direct Testimony of Kurtis W. Castleberry. Kr
|
12:51:00 PM 1/18/2013 |
98. Entergy Arkansas, Inc., submits Highly Sensitive Protected CONFIDENTIAL material {Capcity Sale and Fuel Conversion Services Agreement dated October 22, 2012} of Exhibits to the Phase II Direct Testimony of Kurtis W. Castleberry. Kr
|
9:56:00 AM 3/1/2013 |
99. The Attorney General of Arkansas will not be filing Direct Testimony in this referenced docket today, but reserves the right to file Surrebuttal Testimony if necessary. Cm
|
11:02:00 AM 3/1/2013 |
100. Phase II Direct Public Testimony of John G. Athas on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:07:00 AM 3/1/2013 |
101. Exhibits to Testimony of John G. Athas-6 on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:18:00 AM 3/1/2013 |
102. Exhibits to Testimony of John G. Athas-7 on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:29:00 AM 3/1/2013 |
103. Protected Phase II Direct Testimony of John G. Athas filed under PROTECTED SEAL on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
11:37:00 AM 3/1/2013 |
104. Protected Phase II Exhibit JGA-7 of John G. Athas filed under PROTECTED SEAL on behalf of the General Staff of the Arkansas Public Service Commission. Cm
|
9:21:00 AM 3/1/2013 |
105. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Michael Roberts and Emily Neal for James M. Graves-Attorney in this docket. Kr
|
8:33:00 AM 3/4/2013 |
106. The General Staff of the Arkansas Public Service Commission submits its Motion to Allow Late-Filed Testimony. Sr (ORDER #10)
|
8:39:00 AM 3/4/2013 |
107. Phase II Direct Testimony of Diana K. Brenske on behalf of the General Staff of the Arkansas Public Service Commission. Sr
|
10:36:00 AM 3/4/2013 |
108. Entergy Arkansas, Inc., has no objection to the Public Service Commission General Staff’s Motion to Allow the Late-Filed Testimony of Staff witness Diana Brenske filed in this docket on March 4, 2013. Cm
|
9:29:00 AM 3/12/2013 |
109. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Jana Law for Michael Roberts. Kr
|
10:35:00 AM 3/15/2013 |
113. Phase II Rebuttal Testimony of Kurtis W. Castleberry, Director, Resource Planning on behalf of Entergy Arkansas, Inc. Sr
|
10:32:00 AM 3/25/2013 |
114. Entergy Arkansas, Inc., and the General Staff of the Arkansas Public Service Commission submits Joint Motion to Cancel Hearing and Decide The Case on The Written Record. Sr (Order #11)
|
2:50:00 PM 3/26/2013 |
115. Letter filed by Entergy Arkansas, Inc. (EAI), as a supplement to the Joint Motion to Cancel Hearing and Decide the Case on the Written Record. With respect to paragraph 5 of the Motion, EAI has been authorized by Arkansas Electric Energy Consumers, Inc. to state that AEEC does not object to the Motion. Cm
|
8:01:00 AM 3/28/2013 |
116. ORDER #10 (COMMISSION) Motion to Allow Late-Filed Testimony filed on March 4, 2013, by the General Staff of the Arkansas Public Service Commission is hereby granted. Sr
|
4:24:00 PM 3/28/2013 |
117. ORDER #11 (COMMISSION) Given that there are no unresolved issues in Phase II and absent the objection of any party, Entergy Arkansas, Inc., and the General Staff of the Arkansas Public Service Commission Joint Motion to Cancel Hearing and Decide The Case on The Written Record is granted and the hearing scheduled for May 1, 2013, is cancelled. As requested, the Commission will issue its final decision in this matter based upon the existing evidence of Record. Kr
|
2:34:00 PM 4/10/2013 |
118. Letter filed by Arkansas Electric Energy Consumers, Inc., substituting Thomas P. Schroedter and Robert K. Rhoads for Michael Roberts, Emily Neal and Jana Law in this docket. Kr
|
4:28:00 PM 4/30/2013 |
119. ORDER #12 (COMMISSION) the Commission directs and orders as follows:
1. Entergy Arkansas, Inc. (EAI) Power Purchase Agreement Proposal No. 2445 is approved;
2. EAI shall implement the recommendations for improvement of EAI’s resource planning process as set forth in the Phase II Direct Testimony of Staff witness Athas; 3) EA1 is directed to file within ten (10) days of the date of this Order a revised ANOR Rider in compliance with this Order; and 4) Staff shall file Compliance Testimony within five (5) days of the filing by EAI of its revised ANOR Rider. Kr
|
11:21:00 AM 5/10/2013 |
120. Entergy Arkansas, Inc., submits Rate Schedule No. 55, Arkansas Nuclear One, Unit 1 Interim Capacity Cost Recovery Rider (ANOR), Schedule Sheet 6 of 6, as revised to comply with Order No. 12 issued in this proceeding on April 30,
2013. kr
|
12:22:00 PM 5/10/2013 |
121. Compliance Testimony of Diana K. Brenske, Director, Electric Utilities Section on behalf of The Staff of the Arkansas Public Service Commission. Sr
|
The Arkansas Public Service Commission is open Monday- Friday - 8:00 a.m. - 4:30 p.m
(Governor's Policy Directive No. 5)
Copyright © 2007 - 2013 Arkansas Public Service Commission. All
rights reserved.
Revised: Saturday, May 18, 2013